We use audits to identify if approval holders are complying with environmental law. Projects may be subject to independent audits or compliance audits. These audits help us ensure nature is being protected. Audits also help us improve our own processes and decision making.
Compliance plan
We adopt a risk-based approach to select projects to audit. Projects may be in priority sectors or impact certain environmental values.
Learn more about how we audit through our:
- compliance policy, which outlines our approach
- 2025-27 Environment Compliance and Enforcement Priorities, which lists our compliance and enforcement priorities.
If you believe we need to audit a particular project, you can report a breach.
Audit priorities
Audit priorities are set by the department to ensure a risk based and targeted audit program. The current audit priorities are to:
- Audit approved projects, including their offsets, that impact both critically endangered species and critically endangered Threatened Ecological Communities (TEC).
- Audit offset and land clearing related conditions for projects in the residential and commercial development, mining, and energy sectors that meet a specific risk and impact threshold.
Offsets audit
Offsets can compensate for environmental harm caused by developments. The department is using audits to identify if offsets are being delivered.
Find out more about this work.
Download
Offsets audit report (PDF 744 KB)
Offsets audit report (DOCX 573 KB)
If you need help accessing these files, visit web accessibility.
Report a breach
If someone has breached, or is likely to breach, the EPBC Act, report your concern.
Refer a proposed action with our Referrals and assessments guide.
Summaries of compliance audit findings
| EPBC number (audit date) | Project name and approval holder | Audit scope | Audit findings |
|---|---|---|---|
| EPBC 2017/8024 (2026) |
Eliwana Iron Ore Mine Project, Pilbara Region, WA Fortescue Metals Group Ltd |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 and 12 |
|
| EPBC 2017/8025 (2026) |
Eliwana Railway Project, Pilbara Region, WA Fortescue Metals Group Ltd |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11 and 12 |
|
| EPBC 2018/8246 (2026) |
Jacaranda Ponds residential subdivision, Glossodia, NSW Celestino Pty Ltd |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10 and 11 |
|
| EPBC 2019/8505 (2026) | Findon Road Extension, South Morang, Victoria. City of Whittlesea |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16 and 17 |
|
| EPBC 2016/7724 (2026) | Residential Development, Teviot Road, Jimboomba, 17 km north of Beaudesert, Queensland Celestino Pty Limited |
1, 2, 4, 5 and 6-24 |
|
| EPBC 2018/8299 (2026) | West Angelas Iron Ore Mine – Deposits C, D and G Robe River Mining Co Pty Ltd |
1, 2, 3, 8, 9, 10, 11, 12, 13, 14, 15, and 16 |
|
| EPBC 2013/6926 (2026) | Moolarben Coal Project Stage 1 Modification, NSW Moolarben Coal Operations Pty Ltd |
1, 4, 5, 6, 7, 8, and 9 |
|
| EPBC 2017/7974 (2026) | Moolarben Coal Operations Open Cut Optimisation Modification, NSW Moolarben Coal Operations Pty Ltd |
1, 2, 3, 4, 5, 6, 7, 8, 15, 16, 17, and 18 |
|
| EPBC 2017/7994 (2026) |
Lockyer Energy Project, 2.5km north of Gatton, Queensland. Lockyer Energy Management Pty Limited |
1, 5, 6, 7, 8, 11, 12, and 16 |
|
| EPBC 2017/8091 (2026) | Mordialloc Bypass Project, VIC Department of Transport |
All conditions (13) |
|
| EPBC number (audit date) | Project name and approval holder | Audit scope | Audit findings |
|---|---|---|---|
| EPBC 2018/8287 (2025) |
Maxwell Coal Mine, Hunter Valley, NSW Maxwell Ventures (Management) Pty Ltd |
All conditions (26) |
|
| EPBC 2017/8095 (2025) |
Ripley Road Residential Development, Ripley Valley, Queensland. Jolifields Developments Pty Ltd & The Trustee for Morehampton Capital & The Trustee for the Goldfields QLD Trust |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, and 15 |
|
| EPBC 2013/6771 (2025) |
Manzeene Village residential/commercial subdivision and associated infrastructure, Lara, Victoria DACLAND Capital Limited |
2, 3, 4, 5 and 6 |
|
| EPBC 2014/7213 (2025) |
Proposed Commercial Development, including Earthworks, Construction of Roads and Services Infrastructure in the Wirraway North Precinct, Essendon Airport, Essendon Victoria Essendon Airport Pty Ltd |
5, 6, 7 and 8 |
|
| EPBC 2020/8725 (2025) | Karratha-Tom Price Road Stage 4, WA. Main Roads Western Australia |
1, 2, 3, 4, 14, 15, 16, 17, 18, 19, 20 and 21 |
|
| EPBC 2016/7827 (2025) | Extension to the existing Isaac Plains Mine, near Moranbah, Queensland. Stanmore IP Coal Pty Ltd |
1, 2, 5, 6, 7, 10, 11, 12, 13, 14, 15, 16 and 21 |
|
| EPBC 2016/7843 (2025) |
Extension of Mesa A Warramboo iron Ore Project, West Pannawonica, WA Robe River Mining Co. Pty Ltd |
1, 2, 5, 6, 7, 8, 9, 10, 11, 12 and 13 |
|
| EPBC 2017/8017 (2025) |
Develop the Mesa H Iron Ore Mining Operations 16 km SW Pannawonica, WA Robe River Mining Co. Pty Ltd |
1, 2, 10, 11, 12, 13, 14,15 and 16 |
|
| EPBC 2013/7048 (2025) |
'Lakelands East' residential development, Mandurah, Western Australia Peet Ltd |
1, 2, 3, 4, 5, 6, and 7 |
|
| EPBC 2019/8402 (2025) |
Willowbank Industrial Park Trunk Water Main, Ipswich, Qld Minister for Economic Development Queensland |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, and 13 |
|
| EPBC 2013/6979 (2025) |
Construction of a Residential and Recreational Development on Raby Road, Gledswood Hills, NSW SH Camden Lakeside Pty Limited |
All conditions (12) |
|
| EPBC 2015/7530 (2025) |
Master Planned Residential Development, Greater Flagstone Priority Development Area, Undullah, Queensland Pioneer Fortune Pty Ltd |
1, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 23 and 24. |
|
| EPBC 2019/8471 (2025) |
Bunbury Outer Ring Road Northern and Central Section Project, WA Main Roads |
All conditions (32) |
|
| EPBC 2017/8129 (2025) |
Coppabella Wind Farm, Yass, NSW Coppabella Wind Farm Pty Ltd |
All conditions (38) |
|
| EPBC 2016/7734 (2025) | Residential Mixed Use Development, 78 Copernicus Way, Keilor Downs, Victoria Soho Living (Keilor Downs) Pty Ltd |
All conditions (11) |
|
| EPBC 2015/7431 (2025) | Wilpinjong open cut coal mine extension project, NE Mudgee, NSW Wilpinjong Coal Pty Ltd |
All conditions (9) |
|
| EPBC 2019/8543 (2025) | Bunbury Outer Ring Road Southern Section (EPBC 2019/8543) Commissioner for Main Roads | All conditions (40) |
|
| EPBC 2013/7002 (2025) | Yass Valley Wind Farm Coppabella Wind Farm Pty Ltd | All conditions (16) |
|
| EPBC 2013/6810 (2025) | Bango Wind Farm, Boorowa NSW BWF Nominees Pty Ltd |
All conditions (27) |
|
| EPBC 2021/9005 (2025) | Barrams Road Residential Development, Qld Barrams Land Partners Pty Ltd |
1, 4, 5, 6, 7, 8, 9, 10, 20, 21, 22 and 23 |
|
| EPBC 2020/8800 (2025) | Bussell Highway Duplication Hutton to Sabina Main Roads |
All conditions (24) |
|
| EPBC 2014/7306& (2025) | Springview Village One, Springfield, Ipswich City, Queensland Stockland Development Pty Limited |
1, 2, 3, 4, 5, 6, 7A, 7B, 7C, 8 and 9 |
|
| EPBC 2016/7706 (2025) | Urquhart Bauxite Project, North Qld | 1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, and 20 |
|
| EPBC 2019/8530 (2025) | Holcim Colac Quarry Extension – Stage 5 and Stage 6, 75 Potters Road, Ondit, Victoria | 1, 4, 5, 6, 7, 8, 9, 10 and 11 |
|
| EPBC 2014/7163 (2025) | Rye Park Wind Farm, NSW Rye Park Renewable Energy Pty Ltd |
All conditions (26) |
|
| EPBC 2014/7228 (2025) |
Eastern Leases Project, Groote Eylandt, NT Groote Eylandt Mining Company Proprietary Limited |
1, 2, 6, 8, 9, 11, 12 and 13 |
|
| EPBC 2015/7513 (2025) |
ECCO Ripley residential development, Ipswich, Queensland Bcove 4 Pty Ltd and Ripley Town Holdings Pty Ltd |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 and 14 |
|
| EPBC 2016/7797 (2025) |
Ormeau Quarry Expansion, 12 km north-west of Oxenford, Queensland Boral Resources (QLD) Pty Limited |
1, 2, 3, 4, 5, 6, 8, 9, and 17 |
|
| EPBC 2017/7965 (2025) | Golden Plains Wind Farm, Victoria Golden Plains Shared Assets Pty Ltd |
All conditions (27) |
|
| EPBC 2013/6965 (2025) |
Kanmantoo Copper Mine Expansion, Kanmantoo SA Hillgrove Resources Limited |
1, 2, 3, 4, 5, 6 and 7 |
|
|
EPBC 2016/7833 (2025) |
Subdivision development, Lot 3 (DP184056), Rickards Rd, Castlereagh, NSW Mr Eddy Hawach |
2, 4, 5, 6, 7, 8, 9 and 10 |
|
| EPBC 2021/8926 (2025) |
Kemps Creek Warehouse Logistics and Industrial Facilities Hub, Kemps Creek, NSW Altis Frasers JV Pty Ltd |
1, 2, 7, 8, 9, 10 and 11 |
|
|
EPBC 2017/7895 (2025) |
Carrapateena Project Copper-gold mining and ore processing, Pernatty, SA Oz Minerals Carrapateena Pty Ltd OZM Carrapatateena Pty Ltd |
1, 2, 3, 4, 5, 7, 9, 10, 11, 12 and 13 |
|
|
EPBC 2018/8258 (2025) |
Wollar Solar Farm, near Wollar, NSW Wollar Solar Development Pty Ltd |
All conditions (15) |
|
|
EPBC 2020/8828 (2025) |
Kellyville Precinct, Kellyville, NSW Landcom |
1, 2, 3, 4, 8, 9, 10, and 11 |
|
|
EPBC 2019/8428 (2025) |
Industrial subdivision, 16-36 Doherty’s Road, Laverton North, Victoria Dohertys Junction PTY LTD |
All conditions (18) |
|
| EPBC 2018/8286 (2025) |
The M12 Motorway Project between the M7 Motorway, Cecil Hills and The Northern Road, Luddenham, NSW Transport for NSW |
All conditions (17) |
|
| EPBC 2017/7909 (2025) |
Albion Park Rail Bypass, Wollongong, New South Wales Transport for NSW |
1, 2, 6, 7, 8, and 9 |
|
|
EPBC 2017/8049 (2025) |
Youth Justice Redevelopment Project, Cherry Creek, Victoria Department of Justice and Regulation |
All conditions (26) |
|
|
EPBC 2015/7473 (2025) |
Warehouse Construction and Road Widening 74-94 Centre Road, Hallam, Victoria Chadwick Investments Pty Limited as trustee for Chadwick Family Trust |
1, 2, 3, 4, 5, 5a, 5b, 6 and 8 |
|
|
EPBC 2017/8048 (2025) |
Residential Subdivision, Crest Road, Albion Park, NSW Cavi Development & Partners Pty Limited |
1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, and 21 |
|
|
EPBC 2013/6999 (2025) |
Emerald Hills Estate residential development, Leppington, New South Wales Macarthur Developments Pty Ltd |
1, 2, 3, 4, 5, 6, 7, 9, 10, 11, 12, 13, and 17 |
|
| EPBC 2014/7274 (2025) |
HM Prison Barwon New High Security Unit, Lara, Victoria State of Victoria Department of Justice |
All conditions (10) |
|
| EPBC 2011/6201 (2025) |
Watermark Coal Project NSW Shenhua Watermark Coal Pty Limited |
All conditions (18) |
|
| EPBC 2018/8156 (2025) |
White Rock Wind Farm Modification Gwydir Highway, Glenn Innes, NSW White Tock Wind Farm Pty Ltd |
All conditions (25) |
|
|
EPBC 2016/7744 (2025) |
Industrial subdivision of Lot 1 DP 106143, 327-335 Burley Road, Horsley Park, NSW CSR Building Products Limited |
1, 2, 3, 4, 5, 6, 7, 9 and 10 |
|
|
EPBC 2014/7119 (2025) |
Residential and commercial development, Box Hill North, NSW Stockland Development Pty Limited |
1, 2, 3, 4, 5, 6, 7 and 8 |
|
| EPBC 2016/7746 (2025) |
Stockyard Hill Wind Farm - Wind Energy Facility and associated infrastructure, south-west Victoria Stockyard Hill Wind Farm Pty Ltd |
1, 2, 3, 4, and 5 |
|
|
EPBC 2018/8228 (2025) |
Stonehill residential development stages 22-24, Bacchus Marsh, Victoria Townsville City Project Pty Ltd |
1, 2, 3, 4, 5, 6, 7, 9 and 10 |
|
|
EPBC 2010/5741 (2025) |
Western Highway Project: Beaufort to Ararat Roads Corporation, trading as VicRoads |
All conditions (32) |
|
| EPBC 2017/8121 (2025) |
Sapphire Solar Farm Project, 28 km east of Inverell, NSW Sapphire Solar Farm Pty Ltd |
All conditions (10) |
|
| EPBC 2013/6943 (2025) |
Expansion of operation at Lot 1 Morangup Road, Morangup, WA Bristile Holdings Ltd (trading as Austral Bricks (WA) Pty Ltd) |
1, 3, 4, 5, 6, 7 |
|
| EPBC 2017/8039 (2025) |
Mary Mount Residential Development, Goulburn, NSW Goulburn Estate No 1 Pty Ltd (Devcore Property Group) |
1, 2, 3, 7, 9, 21, 22, 23, 24, 25, 29, 30, 31, and 32 |
|
| EPBC number (audit date) | Project name and approval holder | Audit scope | Audit findings |
|---|---|---|---|
| EPBC 2013/6989 (2024) | Conroys Gap Wind Farm Stage 2, NSW Ark Energy Projects Pty Ltd |
All conditions |
|
| EPBC 2016/7731 (2024) | Parkes to Narromine Section of Inland Rail, NSW Australian Rail Track Corporation Limited |
All conditions |
|
| EPBC 2013/7026 (2024) | Uungula Wind Farm, Goolma, NSW UWF Nominees Pty Ltd |
All conditions |
|
|
EPBC 2017/7921
|
Development of Lot 1665 Wanneroo Road, Sinagra, WA
|
1, 3, 4, 5, 6, 7, 8
|
|
| EPBC 2010/5502 (2024) |
Rocglen Coal Mine Extension, NSW Whitehaven Coal Pty Ltd |
All conditions |
|
| EPBC 2021/8958 (2024) | Goyder South Hybrid Renewable Energy Facility, Wind Farm 1A, 10 km South of Burra, SA Goyder Wind Farm 1 Pty Ltd |
Conditions 1, 6, 7, 8, 9, 10, 11, and 12 |
|
| EPBC 2018/8167 (2024) | 410 Cooper Street and 315 O’Herns Road, Epping VIC Australand C&I Land Holdings Pty Ltd |
Condition 1, 2, 3, 4, 5, 6, 7, 8, 9, and 10 |
|
| EPBC 2015/7561 (2024) | Alkimos city centre and central development Alkimos, WA Lendlease Communities (Australia) Pty Ltd |
Conditions 1, 2, 3, 4, 5, and 6 |
|
| EPBC 2017/8018 (2024) | Geelong-Bacchus Marsh Road Upgrade Project, VIC Victoria Roads Corporation |
All conditions |
|
| EPBC 2017/8035 (2024) | Great Northern Highway, Bindoon Bypass, WA Main Roads WA |
Conditions 1, 4, 5, 6, 7, 8, 9, and 11 |
|
| EPBC 2019/8529 (2024) | Tonkin Highway Grade Separated Interchanges, Wattle Grove, WA Main Roads Western Australia |
Conditions 1, 4, 5, 6, 7, 8, 9, and 10 |
|
| EPBC 2018/8367 (2024) | Mitchell Freeway Extension and Wanneroo Road Upgrade, WA Main Roads Western Australia |
Conditions 1, 2, 5, 6, and 7 |
|
| EPBC 2018/8262 (2024) | Yanchep Rail Extension - Part 2 - Eglinton Station to Yanchep Station, Wanneroo, WA Public Transport Authority of Western Australia |
Conditions 1, 7, 8, and 10 |
|
| EPBC 2014/7364 (2024) | Residential development, 135-161 Barry Road, Thomastown, VIC 135 Barry Road Pty Ltd |
Conditions 1, 2, 2A, 3, 4, 5, 6, and 7 |
|
| EPBC 2017/8119 (2024) | Muchea Industrial Precinct, Lot 809 Great Northern Highway, Muchea, WA Harvis Capital Pty Ltd, as trustee for the Northern Gateway Unit Trust No 2 |
Conditions 1, 3, 4, 6, 7, 8, 9, 10, and 11 |
|
| EPBC 2018/8243 (2024) | Peppertree Quarry Modification 5, Marulan South, NSW Boral Resources (NSW) Pty Ltd |
All conditions |
|
| EPBC 2019/8453 (2024) | Alkimos Desalinisation Plant, Alkimos, WA Water Corporation |
Conditions 1, 2, 3, 9, 10, 11, 12, 13, 14, 15, 26, 27, 28, and 29 |
|
| EPBC 2020/8801 (2024) | The Poplars, Jerrabomberra, NSW Poplars Developments Pty Ltd |
All conditions |
|
| EPBC 2017/8130 (2024) | Middlemount Coal Mine Western Extension Project, QLD Middlemount Coal Pty Ltd |
Conditions 1, 2, 3, 4, and 5 |
|
| EPBC 2016/7717 (2024) | Middlemount Coal Mine, North-eastern Extension, Bowen Basin, QLD Middlemount Coal Pty Ltd |
Conditions 1, 2, 3, 5, and 6 |
|
| EPBC 2017/7930 (2024) | Industrial development, 165-195 O’Herns Road, Epping, VIC Alliance Business Park Pty Ltd |
Conditions 1, 2, 3, 4, and 7 |
|
| EPBC 2009/4890 (2024) | Rural Residential Development & Associated Infrastructure, QLD Denholder Removals and Storage Pty Ltd |
All conditions |
|
| EPBC 2017/8133 (2024) | Trieste 3D Seismic Survey, near Eneabba, WA Beach Energy Pty Ltd (formerly Lattice Energy Limited) | 1, 4 and 5 |
|
| EPBC 2015/7486 (2024) | Industrial Precinct Development, Ravenhall, VIC DWPL Nominees Pty Ltd & Dexus Wholesale Management Limited | All conditions |
|
| EPBC 2013/6941 (2024) | Industrial Development in the Greater Flagstone Urban Development Area 4499-4651 Mount Lindesay Hwy, Nth Maclean (Lot 39) Qld Trust Company (Australia) Limited | All Conditions |
|
| EPBC 2017/8028 (2024) | Divestment of Blocks 3 and 15, Section 22, Barton, ACT Department of Finance |
All conditions |
|
| EPBC 2014/7146 (2024) | Residential development, Lot 609 Yanchep Beach Road, Yanchep WA Peet Funds Management Limited |
Conditions 1, 2, 4 and 9 |
|
| EPBC 2016/7755 (2024) | Staged development of 215, 315W and 325C Cooper Street, Epping VIC Riverlee Caruso Epping Pty Ltd |
Conditions 1, 2, 3, 4, 5, 6 and 8 |
|
| EPBC 2017/8072 (2024) | Canberra Brickworks Precinct access road and Dudley Street upgrade, Yarralumla, ACT CMTEDD ACT Procurement |
All conditions |
|
| EPBC 2021/8908 (2024) | Melton Renewable Energy Hub, Plumpton, VIC MREH Pty Ltd as trustee for the MREH Asset Trust |
Conditions 1, 2, 4, 5, 6, 12, 13 |
|
| EPBC 2016/7700 (2024) | Development of new facility, ANU College of Arts and Social Science, ANU, Acton Australian National University |
Conditions 5 and 9 |
|
| EPBC 2017/7918 (2024) | Commercial Development, 415-425 Cooper Street, Epping, VIC Cooper Park Pty Ltd |
All conditions |
|
| EPBC 2014/7372 (2024) | Residential & Commercial Development, Blocks 4 & 5, Campbell, ACT Doma Group |
All conditions |
|
| EPBC 2015/7516 (2024) | Lindum Vale Residential Development, Mickleham, VIC Satterley Property Group Pty Ltd |
All conditions |
|
| EPBC 2012/6420 (2024) | Industrial Development at Lot A, 650-662 Koroit Creek Rd, Altona North, VIC Taras Nominees Pty Ltd |
All conditions |
|
| EPBC 2017/7914 (2024) | Industrial Development, 10 Gordon Luck Ave, Altona, VIC EMKC AU Industrial 1 Pty Ltd |
Conditions 1, 2 and 4 |
|
| EPBC 2013/6778 (2024) |
Ravenhall Prison Project, Melbourne, VIC Department of Justice and Community Safety |
All conditions |
|
| EPBC 2014/7194 (2024) |
Middle Head Healthcare Residential Facility, NSW Middle Head healthcare Pty Ltd |
All conditions |
|
Independent audits
Some projects have scheduled independent audits written into their approval conditions. The role of the department is to administer these audits and review the findings.
Read our Independent Audit and Audit Report Guidelines (2019).
Summaries of Independent audit findings
| EPBC Number (date) | Project name and Approval Holder | Audit findings |
|---|---|---|
| EPBC 2019/8516 (2026) |
Residential Development, Collingwood Park, Ipswich, Queensland HB QLD Pty Ltd |
|
| EPBC 2018/8330 (2026) |
Roy Hill Iron Ore Mine Expansion, Pilbara Region, WA Roy Hill Iron Ore Pty Ltd |
|
| EPBC 2018/8260 (2026) | Parwan to Melton Pipeline Greater Western Water |
|
| EPBC 2020/8721 (2026) | Inland Rail – Beveridge to Albury excluding Glenrowan, Victoria Australian Rail Track Corporation Ltd |
|
| EPBC 2018/8385 (2026) |
Turtle Sands Holiday Park redevelopment, Mon Repos Beach, Bundaberg, Queensland Australian Tourist Park Management Pty Limited |
|
| EPBC 2017/8066 (2026) |
Residential Development and Conservation, Lot Farral Road, Stratton, WA Peet Stratton Pty Ltd |
|
| EPBC 2016/7817 (2026) |
Mirvac Greater Flagstone Project, Greenbank, Queensland Mirvac Queensland Pty Limited |
|
| EPBC Number (date) | Project name and Approval Holder | Audit findings |
|---|---|---|
| EPBC 2013/6812 (2025) |
Hills Plain Subdivision, Tamworth, NSW Marloelle Pty Ltd |
|
| EPBC 2016/7852 (2025) | Cabbage Tree Road Sand Quarry, Williamtown, NSW Williamtown Sand Syndicate Pty Limited |
|
| EPBC 2002/862 (2025) |
Boral Quarry Extension Boral Resources (Victoria) Pty Ltd |
|
| EPBC 2019/8530 (2025) |
Holcim Colac Quarry Extension – Stage 5 and 6, 75 Potters Road, Ondit, Victoria Holcim (Australia) Pty Ltd |
|
| EPBC 2010/5350 (2025) |
Bulli Seam Operations Expansion, Bulli NSW GM3 |
|
| EPBC 2021/9026 (2025) |
Northern Star Resources – Carosue Dam TSF Cell 4, WA Northern Star (Carosue Dam) Pty Ltd |
|
| EPBC 2016/7676 (2025) | First Nine Master Planned Residential Development, Brookwater, QLD Springfield Land Corporation Pty Ltd |
|
| EPBC 2020/8759 (2025) |
Overhead Transmission Line MacIntyre Wind Energy Precinct, 40km west of Warick, QLD Ark Energy MacIntyre Pty Ltd and MacIntyre Wind Farm Pty Ltd |
|
| EPBC 2016/7852 (2025) |
Cabbage Tree Road Sand Quarry, Williamtown, NSW Williamtown Sand Syddicate Pty Limited |
|
| EPBC 2010/5710 (2025) | Cannonvale Wastewater Treatment Facility Upgrade, QLD Whitsunday Regional Council |
|
| EPBC 2010/5711 (2025) | Proserpine Waste Water Treatment Facility Upgrade, QLD Whitsunday Regional Council |
|
| EPBC 2010/5710 (2025) | Rye Park Wind Farm, Rye Park NSW Rye Park Renewables Energy Pty Ltd |
|
| EPBC 2015/7621 (2025) | Gingin regional landfill near Cullalla, Western Australia Fernview Environmental Pty Ltd |
|
| EPBC 2020/8803 (2025) | Beerburrum to Nambour Rail Upgrade Project, Queensland Department of Transport and Main Roads |
|
| EPBC 2017/8062 (2025) | Upper Swan Residential Development, 25 km north, north-east of Perth, Western Australia Satterley Property Group Pty Ltd. |
|
| EPBC 2010/5642 (2025) |
South of Embley Bauxite and Port Development RTA Weipa Pty Ltd |
|
| EPBC 2007/3480 (2025) | Frankston Bypass, Carrum Downs to Mount Martha, Victoria VicRoads |
|
| EPBC 2016/7706 (2025) |
Urquhart Bauxite Project, 3 km south of Weipa, Queensland Oresome Bauxite Pty Ltd |
|
| EPBC 2006/2522 (2025) |
Koolan Island Iron Ore Mine and Port Facility, Kimberly Region, WA Koolan Iron Ore Pty Ltd |
|
| EPBC 2009/4974 (2025) |
Australian Pacific LNG Project in the Walloons Gas Fields, Surat Basin QLD Australian Pacific LNG Pty Ltd |
|
| EPBC 2018/8330 (2025) |
Roy Hill Iron ore Mine Expansion, Pilbara Region, WA Roy Hill Iron Ore Pty Ltd |
|
| EPBC 2018/8260 (2025) |
Parwan to Melton Pipeline, Victoria Greater Western Water |
|
| EPBC 2017/8004 (2025) |
Shamrock Station Irrigation Project, West Kimberly Region, WA Argyle Cattle Company Pty Ltd |
|
|
EPBC 2010/5344 (2025) |
Surat Gas Expansion Project Arrow Energy Pty Ltd |
|
| EPBC 2003/1138 (2025) |
Wambo Coal Mine Expansion Wambo Coal Pty Ltd |
|
| EPBC 2020/8773 (2025) |
Aldoga Solar Farm Project, near Gladstone QLD Acciona Energy Australia Global Pty Ltd |
|
| EPBC 2019/8563 (2025) |
Gippsland Line Upgrade, Corridor Works – Pakenham to Longwarry East, Victoria Department of Transport |
|
| EPBC 2011/5987 (2025) |
Caloundra South Master Planned Community Stockland Development Pty Ltd |
|
| EPBC 2012/6538 (2025) |
Cairns Shipping Development (Trinity Inlet) Project Far North Queensland Port Corporation Ltd |
|
| EPBC Number (date) | Project name and Approval Holder | Audit findings |
|---|---|---|
| EPBC 2018/8171 (2024) | Grasstree Mine Extension Project, south-west of Middlemount, QLD Anglo coal (Capcoal Management) Pty Ltd |
|
| EPBC 2014/7391 (2024) | Western Sydney International Airport, Badgery’s Creek, NSW Department of Infrastructure, Transport, Regional Development, Communications and the Arts |
Compliant
|
| EPBC 2003/934 (2024) | Kables Sand Quarry Depth Extension, New South Wales Hanson Construction Materials Pty Ltd |
|
| EPBC 2017/8004 (2024) | Shamrock Station Irrigation Project, West Kimberly Region, WA Argyle Cattle Company Pty Ltd |
|
| EPBC 2018/8236 (2024) | Mardie Project, 80 km southwest of Karratha, WA Mardie Minerals Pty Ltd |
|
| EPBC 2018/8330 (2024) | Roy Hill Iron Ore Mine expansion, Pilbara Region, WA Roy Hill Iron Ore Pty Ltd |
|
| EPBC 2009/5123 (2024) | Northern Victoria Irrigation Renewal Project VIC Goulburn-Murray Rural Water Corporation |
|
| EPBC 2017/8062 (2024) | Upper Swan Residential Development, Perth, WA Satterley Property Group Pty Ltd |
|
| EPBC 2019/8546 (2024) | Morley-Ellenbrook Rail Extension Part 2, WA Public Transport Authority of Western Australia |
|
| EPBC 2017/7906 (2024) | Edithvale and Bonbeach level crossing removal, VIC Level Crossing Removal Authority |
|
| EPBC 2008/4221 (2024) | Changes in land use at the Western Treatment Plant Werribee, VIC |
|
| EPBC 2016/7829 (2024) | Residential subdivision, Lot 2 DP1100181 Berkeley, Glenning Valley, NSW |
|
| EPBC 2018/8260 (2024) | Parwan to Melton Pipeline, VIC |
|
| EPBC 2018/0147 (2024) | Perth Airport New Runway Project |
|
| EPBC 2003/1096 (2024) | Curragh North Open Cut Coal Mine, QLD |
|
| EPBC 2017/7906 (2024) | Edithvale and Bonbeach Level Crossing Removal, Edithvale and Bonbeach, VIC |
|
| EPBC 2007/3925 (2024) | The Blackwater Creek Diversion and Coal Mine project, QLD |
|
| EPBC Number (date) | Project name and Approval Holder | Audit findings |
|---|---|---|
| EPBC 2001/329 (2023) | Donnybrook Sand Mine, QLD |
|
| EPBC 2016/7829 (2023) | Residential subdivision, Lot 2 Berkeley Road, Glenning Valley, NSW |
|
| EPBC 2017/8062 (2023) | Upper Swan Residential Development |
|
| EPBC 2014/7391 (2023) | Western Sydney Airport, NSW |
Compliant
|
| EPBC 2006/3157 (2023) | Wyaralong Dam, QLD |
Compliant
|
Some audit findings appear on the approval holder's website. Please check their website first, and if you need further help, contact us on audit@nationalepa.gov.au.
Non-compliances identified by audits are reviewed and prioritised for further compliance action. Visit our Compliance outcomes and Infringement notices pages for more information and recent outcomes.
Older compliance audit findings
You'll find summaries of findings for projects audited since 2006 on the Trove Website Archive, maintained by the National Library of Australia.
- 2019 compliance audits
- 2018 compliance audits
- 2017 compliance audits
- 2016 compliance audits
- 2015 compliance audits
- 2014 compliance audits
- 2013 compliance audits
- 2012 compliance audits
- 2011 compliance audits
- 2010 compliance audits
- 2009 compliance audits
- 2008 compliance audits
- 2007 compliance audits
- 2007 Burnett River Dam (Paradise Dam) compliance audit report
- 2006 compliance audits