The Environment Protection (Sea Dumping) Act 1981 (Sea Dumping Act) regulates the loading and disposal at sea of dredged or excavated material in Australian waters.
Requirement for a permit
If you wish to dispose of capital and/or maintenance dredged or excavated material at sea, you will need a sea dumping permit.
Permits ensure:
- the impacts of dredged material disposal are adequately assessed
- any impacts to sensitive marine environments are managed responsibly and effectively.
If you are considering loading and disposing of material at sea, you should evaluate:
- Alternatives to disposal at sea
- waste minimisation approaches
- site and impact assessments
- management and monitoring programs.
If the proposed action is within the Great Barrier Reef Marine Park (GBRMP), you need a permit from the Great Barrier Reef Marine Park Authority (Reef Authority). Refer to the Reef Authority’s dredging policy and submit any enquiries or applications through assessments@gbrmpa.gov.au.
Sediment sampling and analysis plan (SAP) and SAP implementation reports (pre-application)
We encourage you to provide a sediment sampling and analysis plan (SAP) before submitting a permit application. A SAP is specific to dredging, loading, and/or dumping applications.
There is no statutory requirement to submit a SAP. However, it provides the National Environmental Protection Agency (National EPA) and the applicant with greater certainty that:
- the proposed sediment sampling design is sound
- any sediment contamination can be adequately managed.
Once the National EPA agrees to your SAP, you will have greater certainty that:
- your SAP implementation report (SAPIR) is based on the best possible methodology
- your SAPIR provides support for the conclusions drawn in an application.
Applications should address matters in the National Assessment Guidelines for Dredging 2009 (NAGD) including:
- the history of the area to be dredged
- details of contaminants
- rationale for the proposed sampling design
- rationale for the proposed disposal site.
You may not need a SAP if sediment sampling has occurred in the past 5 years and the results still apply. Results may still apply if the dredged material and the disposal site are the same as before and will remain so for the life of the permit. We will discuss this requirement in a pre-application meeting.
Dredging may involve both clean and contaminated sediments. Sediments may be clean if they are dredged from areas remote from pollution sources. However, ports and harbours near urban or industrial areas may have sediments that are contaminated with:
- chemicals
- heavy metals
- organic compounds.
Contaminated sediments require special attention. You can undertake initial sediment sampling and testing using a SAP. These results must be included in a permit application.
Dredge disposal sites
If you are considering a new disposal site in Australian waters, your proposed disposal site options must have:
- minimal impacts to the marine environment
- minimal interference with other marine uses and users
- acceptable economic costs.
Your analysis and justification must be submitted with your permit application. Your analysis should include:
- identification of candidate sites, including site feasibility and constraints mapping
- characterisation of candidate sites, including physical, chemical, and biological characteristics
- other uses in the local area
- assessment of potential impacts
- site management and monitoring plan.
Dredging guidelines
You should read the application form together with the National Assessment Guidelines for Dredging 2009.
This guidance provides procedures to follow for:
- sampling
- testing
- evaluating alternatives to disposal at sea
- assessing suitability of material for disposal at sea
- evaluating and monitoring disposal sites.
If you use a specialist report to fulfil these requirements, you must:
- attach the full report to the application form
- provide brief answers within the application form
- cross-reference the answers in the form to the relevant sections of the report.
Additional Guidance on Tributyltin
Tributyltin (TBT) is a toxic and persistent marine pollutant. It occurs in anti-fouling paint found on some older vessels and marine structures. As a result, TBT often concentrated in harbours, ports, and other dredging sites.
TBT behaves in a specific way in marine sediments. A decision tree and explanatory note was created to help you assess these sediments. Please use this rather than Figure 3 of the NAGD (page 12), when assessing TBT.
Decision tree and explanatory note for assessment of tributyltin (TBT) in dredge spoil (PDF 1.13 MB)
Decision tree and explanatory note for assessment of tributyltin (TBT) in dredge spoil (DOCX 393 KB)
Long Term Monitoring and Management Plan and assessment checklist
If you are applying for a 10 year permit, you must have a Long Term Monitoring and Management Plan.
Long Term Monitoring and Management Plan (PDF 49 KB)
Long Term Monitoring and Management Plan (DOCX 121 KB)
We assess your Long Term Management and Monitoring Plan against a checklist.
Checklist for completing long term monitoring and management plans for dredging (PDF 70 KB)
Checklist for completing long term monitoring and management plans for dredging (DOCX 129 KB)
Permit application form and fee
The application fee for a permit to dispose of dredged or excavated material into any part of the sea is:
- if the volume of the material is less than 100,000 cubic metres - $10,000
- if the volume of the material is more than 100,000 cubic metres - $23,500.
For more information on how to pay the fee, visit: how to apply for a sea dumping permit.
Download
Permit application form to dispose of dredged or excavated material at sea (PDF 344 KB)
Permit application form to dispose of dredged or excavated material at sea (DOCX 113 KB)
If you need help accessing these files, visit web accessibility.